Rendering; View of the cantilevered deck outside the clubhouse
We introduced the ground breaking of our residential project Calcaire on the blog back in November along with renderings and videos of the fascinating process of relocating behemoth trees. We're on site this week with framing updates and the anticipation of all of our steel arriving on three trucks over the course of March. The lack of framing sure is deceiving ...the remainder of the house envelope is glass and steel!
Stone and grout mock up
Entering the breezeway from the garage
Future home of the steel and glass stair
View west looking towards the kitchen
Upper level hallway
Cantilevered deck overlooking the Flatirons
Framed view of the Flatirons
Sunken wine storage