This last week brought exciting updates as the massive steel bent is lifted up and over into place at Calcaire to begin the formation of the gable end at the main entry. Only one more steel delivery until we can finish roofing the entire structure and really begin to visualize the scale and height of these grand gable spaces. More more progress posts of Calcaire, click into the "Calcaire" tag below the post.
View of the installed bent - the structural framework perpendicular to the length of the gable designed to carry lateral and vertical loads
View of hall towards Master Gable
Master Suite gable in progress
Master Suite framing partition wall between bedroom and bath
Sunken wine cellar; Clubhouse awaiting it's steel framework